Quality, Testing and Inspection

Quality is built into every stage of manufacturing.

01 · Quality control

Eight stages from incoming material to release.

  1. 01Incoming Inspection
  2. 02Material Traceability
  3. 03Production Control
  4. 04Welding Inspection
  5. 05Dimensional Inspection
  6. 06Load Testing
  7. 07Final Inspection
  8. 08Release

Integrated QC supports consistent manufacturing, traceability and project documentation.

02 · Testing and inspection

Verification from fabrication to final release.

  • Load Testing

    • Lifting capacity verification
    • Lifting test
    • Arrangement verification
  • Welding Inspection

    • Weld quality control
    • Welding procedure compliance
  • Dimensional Inspection

    • Manufacturing accuracy
    • Final dimensional check
  • NDT

    • Non-destructive testing
    • As required by project
  • Final Inspection

    • Product verification
    • Documentation review
  • Certification Support

    • Inspection coordination
    • Third-party witnessing

03 · Standards explained

What the codes on our units mean.

  • DNV 2.7-1

    DNV's standard for offshore containers, now published as DNV-ST-E271. It sets requirements for design, manufacture, testing, certification, marking and periodic inspection of units lifted and transported at sea.

  • EN 12079

    The European standard for offshore containers and their lifting sets. It has been continued by EN ISO 10855.

  • ISO 10855

    The international standard in three parts: part 1 the container's design, manufacture and marking; part 2 the lifting set; part 3 periodic inspection, examination and testing.

  • A60

    A fire integrity class for divisions such as walls and decks: steel or equivalent construction that holds back smoke and flame for 60 minutes in a standard fire test, insulated so the far side stays within a set temperature rise.

Certification by DNV, ABS, BV, LR or ISO, as the project requires, with inspection coordination and third-party witnessing.